Carbon Steel Pipe
Carbon Steel Pipe
Carbon Steel Pipe
Carbon Steel Pipe
Carbon Steel Pipe
  • Carbon Steel Pipe
  • Carbon Steel Pipe
  • Carbon Steel Pipe
  • Carbon Steel Pipe
  • Carbon Steel Pipe

Carbon Steel Pipe

For small-diameter carbon steel pipes (outer diameter ≤ 108mm), they are usually packaged in bundles, and each bundle is tied and fixed with steel or plastic belts to prevent looseness during transportation; For large-diameter carbon steel pipes (outer diameter > 108mm), single-piece packaging will be wrapped with straw ropes, bubble film and other materials to prevent surface scratches.

Classification :

PRODUCT DETAILS

description 

Carbon steel pipe is a hollow tubular steel made of carbon steel through hot rolling, cold rolling, cold drawing and other processes.

Carbon steel can be divided into low carbon steel (carbon content ≤ 0.25%), medium carbon steel (carbon content 0.25% - 0.6%) and high carbon steel (carbon content > 0.6%). The steel with different carbon content determines the difference in performance and use of carbon steel pipe.

There are mainly hot-rolled carbon steel pipe and cold-rolled carbon steel pipe. Hot-rolled pipe has high production efficiency and large pipe diameter, and is often used for conveying fluids or structural support; cold-rolled pipe has high precision and thin pipe wall, which is suitable for manufacturing mechanical parts and precision pipes.

parameter

Product Hollow Tube / Black Round Steel Welded Pipe
Technique Electrical Resistance Weld (ERW)
Material Q195 = S195 / A53 Grade A Q235 = S235 / A53 Grade B / A500 Grade A / STK400 / SS400 / ST42.2 Q345 = S355JR / A500 Grade B Grade C
Standard EN39, BS1139, BS1387, EN10255, ASTM A53, A500, A36, A795, ISO65, ANSI C80, DIN2440, JIS G3444, GB/T3091, GB/T13793
Size OD:20-660mm;WT 1.5-10.0mm ;Length: 1-12m

Mechanical properties

Yield strength: The yield strength of low carbon steel pipe is generally 200-300MPa; the yield strength of medium carbon steel pipe is about 300-500MPa.
Tensile strength: The tensile strength of low carbon steel pipe is 370-500MPa; the tensile strength of medium carbon steel pipe is 500-650MPa.
Elongation: The elongation of low carbon steel pipe is relatively high, generally 20%-35%; the elongation of medium carbon steel pipe is relatively low, about 15%-25%.

Standards

National standard: GB/T 8162 (seamless steel pipe for structure), GB/T 8163 (seamless steel pipe for conveying fluid), GB/T 3091 (welded steel pipe for low pressure fluid conveying), etc.
American standard: ASTM A53 (welded and seamless steel pipe), ASTM A106 (seamless carbon steel pipe for high temperature).​
European standards: EN 10217 (welded steel pipes for pressure), EN 10216 (seamless steel pipes for pressure).

Use

Structural support: Carbon steel pipes are used to build scaffolding and construction.
Pipeline system: As a building water supply and drainage pipe, it can also be used for heating pipes, ventilation pipes, etc.
Fluid transportation: used to transport various fluid media such as oil, natural gas, steam, industrial wastewater, etc.
Mechanical manufacturing: manufacturing mechanical parts, such as hydraulic cylinders, drive shafts, automotive parts, etc.
Power engineering: boiler pipes and steam pipes used in power plants.
Automobile manufacturing: some automotive parts, such as exhaust pipes and drive shafts, are made of carbon steel pipes.
Shipbuilding: hull structure and piping system of ships.

Advantage

1.High strength: Carbon steel itself has high strength and hardness, and can withstand greater pressure and load.
2.Good processing performance: Carbon steel pipes can be processed by welding, cutting, bending, drilling and other processing methods.
3. Cost advantage: Low cost.
4. Good weldability: Low carbon steel pipes have good welding performance.

Package

For small-diameter carbon steel pipes (outer diameter ≤ 108mm), they are usually packaged in bundles, and each bundle is tied and fixed with steel or plastic belts to prevent looseness during transportation;
For large-diameter carbon steel pipes (outer diameter > 108mm), single-piece packaging will be wrapped with straw ropes, bubble film and other materials to prevent surface scratches.

FAQ: 

Q:Can you send samples?
A:Of course, we can send samples to all parts of the world, our samples are free, but customers need to bear the courier costs.

Q:What product information do I need to provide?
A:You need to provide the grade, width, thickness, coating and the number of tons you need to purchase. 

Q:About product prices?
A:Prices vary from period to period due to cyclical changes in the price of raw materials. 

Q:What are the certifications for your products?
A:We have ISO 9001, SGS, EWC and other certifications. 

Q:How long does your delivery time take?
A:In general, our delivery time is within 7-10 days, and may be delayed if the demand is extremely large or special circumstances
occur. 

Q:Can I go to your factory to visit?
A:Of course, we welcome customers from all over the world to visit our factory. 

Q:Does the product have quality inspection before loading?
A:All our products are strictly tested for quality before packaging, and unqualified products will be destroyed.
 

Customer feedback

CUSTOMER CASES

Ship To Iraq

22,000 tons of cold rolled steel shipped to Iraq

Shipping to Japan

12,000 tons of cold rolled steel shipped to Japan

Shipping to Russia

5,000 tons of galvanized and color-coated coils shipped to Russia

Ship to Africa

6,000 tons of galvanized and color-coated coils shipped to Africa

APPLICATION AREAS

Factory

Factory

Excavator

Excavator

High-speed rail

High-speed rail

Automobile manufacturing

Automobile manufacturing

Wind power generation

Wind power generation

Mining

Mining

PARTNER

Partner
Partner
Partner
Partner
Partner
Partner
Partner
Partner
Partner
Partner
Partner
Partner

FACTORY WORKSHOP

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

Factory Workshop

FAQ

Once the products received by customer were found not comply with the products or contract demands, what will you do?

Once the products received by customer were found not comply with the products or contract demands, what will you do?

A: We will compensate the customer for all the loss without any hesitation.
A: We will compensate the customer for all the loss without any hesitation.
Do you provide samples Is it free or extra?

Do you provide samples Is it free or extra?

A: Yes, we could offer free samples.
A: Yes, we could offer free samples.
What certifications do your products have?

What certifications do your products have?

A: We have ISO 9001, SGS, EWC and other certifications.
A: We have ISO 9001, SGS, EWC and other certifications.
What kind of payment terms would you accept?

What kind of payment terms would you accept?

A: We always do T/T.30% T/T as deposit,70% T/T as balance.
A: We always do T/T.30% T/T as deposit,70% T/T as balance.
What is the delivery time?

What is the delivery time?

A: 10-15 days
A: 10-15 days
What is your MOQ?

What is your MOQ?

A: We will provide Original Mill Usually 25 tonnes, but it can be adjusted according to your needs and the actual situation of the inventory.
A: We will provide Original Mill Usually 25 tonnes, but it can be adjusted according to your needs and the actual situation of the inventory.

RELATED PRODUCTS


GET A FREE QUOTE

Shandong Tianxinda Special Steel Co., Ltd.

Apply For Discount !

24 Hours Online Service

Provide You With Free Industry Solutions

Quality Assurance

%{tishi_zhanwei}%